QUALITY CONTROL
Sewing Quality Controlling Standard Operating Procedure
Here is the standard operating procedure of sewing quality control
1.Quality inspectors check the sample and trim card of his process at the very beginning of a style. Inspector also checks SPI, thread, label, and First Bundle specially and will have to take over his work from the Quality controller for a new style.
2.Inspectors know his all measurement of his checkpoint and will have to explain clearly if anybody asks.
3.No defect allowed passing from QI checkpoint and the defect will be limited in one bundle in any process.
4.Bundle cut has to maintain as per the cutting report, short and mistake bundle not to pass by QC checkpoint.
5.Measurement tape hanging on every QI neck
6.Every in-process report to be updated, to be signed by QC and line supervisor in every hour.
7.Any process mistake and size mistake body go back to operation making the correction.
8.Every running style Sample and Trim card showing operation clearly displayed on each line.
9.Every quality inspector following up machine cleaning before breaking up the factory every day and 100% machine having oil cards.
10.Washed Garments not allowed to keep the sewing line. If there any GMTS in sewing line, Output QI and Line QC have to handover in finishing.
11.Every Line QC is responsible for all types of buyer requirements of his line.